Emergent Microgrid installs, owns, and operates utility-scale battery storage on your property. You provide the land — we handle everything else, and pay you for it every year.

Flagship: 2–5MW / 20MWh EMCS: 249kW Commercial Massachusetts Program
2–5 MW / 20MWh
Utility-Scale Flagship Program
Flagship
XFMR (Transformer) 20ft Container 20ft Container 20ft Container Grid
2–5 MW
System power
20 MWh
Storage capacity
≥ 4,000
Sq ft needed
15–20 yr
Ground lease
  • 💰
    Annual ground-lease income Steady, contracted revenue from land you're not actively using. No capital investment required from you.
  • Unlock electrical capacity expansion Hosting creates a direct path to upgrade your own service — add equipment, EV chargers, or new load without a multi-year utility waitlist. This alone can be worth more than the lease.
  • 🌱
    Grid support for your community Your land helps defer costly substation upgrades and supports cleaner, more reliable electricity for the surrounding area.
  • 🏗️
    We own and operate everything Engineering, permitting, installation, maintenance — Emergent handles it all. Your involvement after signing is minimal.
Inquire about the 5MW program →
249 kW
EMCS Commercial Program
Fall 2026 — Open
BESS Grid Your facility 249kW BESS
249 kW
System power
996 kWh
Storage
$0
Capital to host
5–10 yr
Min Agreement
  • 📉
    Slash peak demand charges Discharge during peak windows to cut the spikes that drive your utility bill.
  • 🔌
    Backup power capability Keep critical loads running during outages — no generator required.
  • 💵
    MA utility incentives Program incentives significantly offset project costs. We run a site model before any commitment.
Explore EMCS enrollment →
For 5MW hosts — a hidden benefit

Your next transformer upgrade might come from hosting us.

In Massachusetts, the queue for new electrical service capacity — whether you want to add manufacturing equipment, EV charging stations, or simply support more tenants — can take years and cost hundreds of thousands of dollars.

Hosting a 5MW battery system creates a meaningful relationship with your local utility and positions you to access expanded electrical infrastructure as part of the project conversation. It's not guaranteed, but it's a real door that doesn't open any other way.

If electrical capacity is a constraint on your business growth today, this may be the single highest-value benefit of a host partnership.

Before 200A svc Capacity limited Host BESS After 4,000A svc BESS Capacity expanded Illustrative — actual outcomes vary by utility and project
The Process

From first call to first check

1
📋

Site qualification

We review your property — size, utility territory, location, and zoning. Most commercial and industrial sites qualify. It typically takes one call and a recent utility bill.

2
📄

Permitting & engineering

Emergent handles all engineering, environmental review, and permit applications at our cost. Your involvement is minimal — usually a signature or two on authorization forms.

3
🔋

Installation & lease income

3–5 weatherproof 20-foot containers and a transformer are installed on your site. Once commissioned, annual ground-lease payments begin. We own and operate the system for the full lease term.

Talk to a real person

Whether you have a specific property in mind or just want to understand how the program works — reach out. We do a quick site check in the first conversation and tell you what, if anything, makes sense for your location.

Henry Meyer, President — hmeyer@emergentmicrogrid.com

© 2026 Emergent Microgrid, Inc. · Delaware-incorporated · Operating in Massachusetts

emergentmicrogrid.com  ·  EMCS Commercial Program

* Emergent Microgrid is exploring a small-scale residential battery program for a future cohort. No pricing or anrollment is currently available. If you're interested in a residential installation, email contact@emergentmicrogrid.com and we'll add you to the interest list.